Construction Week 14

Construction Week 14

Evergreen continued putting up wall hat channel and roofing over the south and east sides of the building. At ground level Tipton and and High Point put in the plumbing and electrical infrastructure that will sit below the concrete slab. There was a dense thicket of PVC sticking out of the ground by the time Tipton was done. In the meantime, French Concrete prepared the mezzanine deck for the concrete pump truck that showed up on Friday. Our site superintendent, Justin, captured some excellent video of the mezzanine deck being poured on Friday, so make sure the check out the footage at the tail end of the video (starts at 1:52).

Most of the time-lapse in this video is roughly 30 minutes of real-time per second of video. YouTube will let you change the playback speed if you want to see things more slowly or quickly. If you’ve got the bandwidth, you can also boost the resolution all the way up to 4K! Just click on the gear icon.

– Brandon

https://www.facebook.com/ascentstudioclimbing/posts/869167573227170

Underground

Construction Week 14

Mezzanine deck

Construction Week 14