fbpx

Construction Week 16

Construction Week 16

As Evergreen continues to put up the metal sheeting on the walls of the building, our building is beginning to take it’s final recognizable form. Inside the building, they’ve also been installing the wall hat channel and setting the steel to support the climbing mezzanine at the south end of the building. Meanwhile, French Concrete has been very active preparing to pour the concrete slab on grade. At the end of the video, you can see them lay out the plastic sheeting that forms the vapor barrier below the concrete slab. The pump truck was scheduled for early Monday morning, so look forward next week to some great video of French Concrete doing the hard work required to pour that slab.

Most of the time-lapse in this video is roughly 30 minutes of real-time per second of video. YouTube will let you change the playback speed if you want to see things more slowly or quickly. If you’ve got the bandwidth, you can also boost the resolution all the way up to 4K! Just click on the gear icon.

– Brandon

https://www.facebook.com/ascentstudioclimbing/posts/874321722711755