Construction Week 25

Construction Week 25

Entre-Prises crews worked hard to build out more of our climbing walls this week, finishing up most of their work from the previous week. On Monday they took delivery of another load of panels and steel, and by Friday they had most of that steel in place to start paneling most of our top rope terrain. You’ll see those walls take shape in the next video. Meanwhile, Holsinger made the sheetrock ready for paint, and Poudre Valley Air continued to install the labyrinth of ductwork throughout the building. Outside in the heat, French Concrete formed and poured more curb and gutter. We are getting closer to having an actual parking lot.

Most of the time-lapse in this video is roughly 45 minutes of real-time per second of video, but we slowed it down for many portions and sped it up for others. YouTube will let you change the playback speed if you want to see things more slowly or quickly. If you’ve got the bandwidth, you can also boost the resolution all the way up to 4K! Just click on the gear icon. If you’re viewing this on a computer, you can enable annotations in the YouTube menu to see who was doing what on which days.

– Brandon
https://www.facebook.com/ascentstudioclimbing/posts/921982337945693