fbpx

Construction Week 4

Construction Week 4

This week was all about concrete! French Concrete finished forming, positioning rebar, and pouring the interior footing pads that will support the large columns of the metal building. Next up is doing the same process for foundation to support the building walls and pilasters. You can see all of the concrete forms being shuffled around the site like stacks of cards as they form up and pour each section of the foundation. This work is all in preparation for the arrival of the huge load of steel for the building, due to arrive next week (Mar 21 – 28) from the fabrication site in Utah.

Each second of the video corresponds to 30 minutes of real-time footage (30 frames per second, 1 minute between frames). YouTube will let you change the playback speed if you want to see things more slowly. If you’ve got the bandwidth, you can also boost the resolution all the way up to 4K! Just click on the gear icon.

We’ll release a video every week, so stay tuned for the next construction update.

– Brandon

https://www.facebook.com/ascentstudioclimbing/posts/817072958436632