Construction Week 8

Construction Week 8

This was the final week to prepare the site for erection of the metal building. French Concrete finished up the concrete work, with the last pour happening on Monday. They’ve been on the job for weeks now, but Tuesday marked the end of their foundation work as they started removing and packing up their forms. Around the same time, Brinkman put up the blue foundation insulation and transferred gridlines. By Thursday the site was cleared for Dunrite to spend the rest of the week backfilling everything. As of midday Saturday the site is ready for steel!

Each second of the video corresponds to 30 minutes of real-time footage (30 frames per second, 1 minute between frames). YouTube will let you change the playback speed if you want to see things more slowly. If you’ve got the bandwidth, you can also boost the resolution all the way up to 4K! Just click on the gear icon.

We’ll release a video every week, so stay tuned for the next construction update.

– Brandon

https://www.facebook.com/ascentstudioclimbing/posts/838350122975582